Rail
In rail systems, size is the determining factor. A railcar does not fit a standard paint booth; the booth is not fitted to the part — the part defines the booth.

Process requirements of the sector
Railcar booths reach tens of metres in length. At this scale, distributing ventilation evenly along the booth is a far harder engineering problem than achieving air velocity at a single point.
Operator access is solved with multi-level platforms. The platforms must not disturb airflow inside the booth and must meet fire safety requirements.
Handling long parts calls for special solutions; in most applications the part stays fixed while the application team and equipment move.
What is decisive in this sector
- Even air distribution along the booth length
- Multi-level platforms and safe access
- High-flow ventilation and energy management
- Handling or fixed-station layout for long parts
Related topics
Let’s arrange a preliminary technical discussion for an investment in this sector. Share your part dimensions, target capacity and paint system, and our process engineer will prepare an outline concept and budget range.
