Energy

Energy equipment operates outdoors, often under marine influence, for decades. The coating system is selected for that service life; access for maintenance is frequently impossible.

Process requirements of the sector

Coating life depends largely on surface preparation. The surface cleanliness grade and profile depth achieved by blasting are the first item in the coating specification.

High-build coating systems are used in these applications. Thick application directly increases drying time and the ventilation demand inside the booth.

Part dimensions determine booth size. For tower sections and large structures, booths are usually designed project-specifically and erected on site.

Key aspects in this sector

  • Surface cleanliness grade and profile depth targets
  • Extended drying capacity for high-build coatings
  • Project-specific booth dimensions for large parts
  • Site installation and commissioning

Related topics

Let’s arrange a preliminary technical discussion for an investment in this sector. Share your part dimensions, target capacity and paint system, and our process engineer will prepare an outline concept and budget range.

Go to the quote form · Contact channels